Status:
The power plant was attacked twice with missiles in October, then in December, causing extensive damage and destroying the autotransformers and smaller power transmission system equipment. After missile attack on 14th of January TPPs was damaged significantly (including total damage of turbine, generator and transformer of one of power units)
Unit Name Unit Quantity
Single phase autotransformer 210 MVA* 3
Three-phase autotransformer 240 МVA* 1
Single phase autotransformer 133 MVA* 1
Three-phase transformer 250 МVA* 1
Steam turbine 200 MW 1
Generator 200 MW 1
Power unit control system 1
Total: USD 42.8 mln
Impact:
The replacement of this equipment will help to ensure a stable supply of energy and heat supply for more than 1,8 million people. The European and Ukrainian power systems are connected through the power plant's switchgear, and without its restoration transit capacity will be limited to around 500 MW.
TPP 2
The plant is the sole electricity supplier for a coal mining company that employs 8,000 people and supplies Ukraine's energy sector and Ukrainian railroads.
TPP 3
This is one of the closest power plants to the frontline. The operation of the remaining coal mines in the region, as well as the largest coking coal mine are dependent on it.
TPP 4
The TPP was shelled by missiles and drones in October, November and December. The consequences of these attacks were the destroying of power transmission equipment, after bombardments in November, the circulation pumps for plant water supply were damaged.
TPP 5
TPP was shelled twice by missiles in October (and previously by artillery) causing the heavy damages and destroying the autotransformer cable-line 330 kV and smaller equipment on power transmission system.