PROJECTS THAT NEED FINANCING

TPP 2

Status:
The plant is the sole electricity supplier for a coal mining company that employs 8,000 people and supplies Ukraine's energy sector and Ukrainian railroads. The TPP was attacked with missiles in November 2022 and then in February 2023, causing extensive damage and destroying the autotransformer, power transformer, steam turbine and generator of one of power units.
Unit Name Unit Quantity
Three-phase autotransformer 250 MVA 1*
Three-phase transformer 200 MVA 1
Power unit control system 1
Steam turbine 160 MW 1
Generator 160 MW 1
Power unit control system 2
Total: USD 44.5 mln
Impact:
The replacement of this equipment will help to ensure a stable supply of energy and heat for more than 400,000 people, as well as the continued operation of the mining company.
TPP 1
The power plant was attacked twice with missiles in October, then in December, causing extensive damage and destroying the autotransformers and smaller power transmission system equipment.
TPP 3
This is one of the closest power plants to the frontline. The operation of the remaining coal mines in the region, as well as the largest coking coal mine are dependent on it.
TPP 4
The TPP was shelled by missiles and drones in October, November and December. The consequences of these attacks were the destroying of power transmission equipment, after bombardments in November, the circulation pumps for plant water supply were damaged.
TPP 5
TPP was shelled twice by missiles in October (and previously by artillery) causing the heavy damages and destroying the autotransformer cable-line 330 kV and smaller equipment on power transmission system.